High Bridge
This impressive historic railway bridge in the South Island was in desperate need of maintenance. Brazier Scaffolding were contracted to provide a suspended access scaffold for blast and paint works. The scaffold also needed to be encapsulated in order to contain the lead paint from the surrounding environment.
Freestanding bridge structure
-
Layher Allround Lightweight Steel Scaffolding
-
Otago, New Zealand
-
Over 150 tonne of Layher Allround was required for this project. The real challenge for us was logistical.